Setting up an automated 12,000 birds/hour poultry plant: assessing plots and comparing over 10 new and used slaughter lines

An investor wants a large automated plant of 12,000 birds/hour. He has several plots and more than ten offers for new and used lines at very different prices. The questions: which plot, which line, and at what real cost?

Selected plotRecommended linePlot assessmentLine comparison
Conceptual model of the method: assessing the available plots, then comparing the offered lines technically and financially, up to the recommendation.
FacilityFully automated poultry plant
Capacity12,000 birds/hour
CountrySaudi Arabia
Offers evaluatedOver 10 lines and complete plants, new and used
Equipment sourcesEurope, Turkey and China
DurationAbout two months

The challenge

Slaughter line offers cannot be compared on price alone. A cheap used line may need refurbishment and spares that double its cost, and a new line with a high rated capacity may never reach it with manual halal slaughter. The plot changes the numbers too: lease or buy, available utilities, and contract terms.

What I did

Assessing the plots

  • Comparing several plots on location, available utilities and fitness for a plant.
  • Reviewing the proposed leases and their terms, and assessing them financially over the project life.

Comparing slaughter lines

  • Studying offers for over 10 lines and complete plants, new and used, from Europe, Turkey and China.
  • Contacting and negotiating directly with manufacturers and suppliers on price, specification and scope of supply.
  • Technical screening of each line: real capacity with manual slaughter, condition of used equipment, spare parts availability, shipping and installation.
  • A feasibility study for each line based on its price, capacity, expected problems and running cost.
Offers received: over 10 new and used linesTechnical screening: real capacity, condition, complianceShortlist and direct negotiationA feasibility study for each lineRecommendation to the investor
Evaluation method: from every offer received to a shortlist, then a feasibility study for each line before the recommendation.

Conceptual drawing, with no supplier names or prices.

The outcome

  • The investor has one clear comparison of every option, instead of scattered offers in different formats.
  • He knows the real cost of each line after refurbishment, shipping, installation and running, not just the quoted price.
  • He received the complete studies to decide and negotiate on.

Scope of work

Plot assessmentLease reviewRequesting equipment offersSupplier negotiationTechnical screeningUsed equipment assessmentFeasibility study per lineComparison and recommendation

Common questions

Is a new or a used slaughter line better?

A good used European line can save a lot, provided it is inspected before shipping and refurbishment, spares and installation are costed. A new line is clearer on cost and support. The decision rests on the full comparison, not the price alone.

What should be checked in a used line before buying?

Year of manufacture and running hours, the condition of the conveyor, sprockets, pluckers and evisceration machines, panels and software, completeness of parts, and spare parts availability for that model.

Why do some lines never reach their rated capacity?

Rated capacity is often based on stunning and automatic killing, while manual halal slaughter and the number of hangers and slaughterers set the real line speed.

Does the plot affect the choice of line?

Yes. Available power, water and drainage, building space and the lease term all change a line's cost and viability.

Comparing slaughter line offers?

Ask your question on WhatsApp. Technical questions are welcome, with no obligation.

Ask on WhatsApp

More work

Project data belongs to its owner; only the scope and method are shown. Terms and privacy